Electric energy-efficient equipment that is not included on the prescriptive application forms may be considered as a custom measure. In general, this equipment must exceed the prescriptive requirements and not be required by Maryland energy code nor considered standard industry practice. The proposed project or equipment must have verifiable electric energy savings and pass the program cost effectiveness criteria.